We elect people to take decisions not to waste our money with exercises such as the 4-week long Public Inquiry over 800m of cycle track in Bloomsbury.
Everyone’s time and money would be better spent in solving some of the issues raised by the experimental phase in the creation of the cycle track. That is exactly why one runs a preliminary phase: to be able to improve the project by observing the behaviour of people using the infrastructure.
The key objection to the scheme has been that traffic has been displaced to other streets in Bloomsbury. That is the problem to solve, not whether to retain the cycle tracks, because they have been an indisputable success. So the whole essence of the Public Enquiry is bogus: it focuses on the viability of something that is obviously successful, rather than focusing efforts in solving some of the “collateral” issues.
When I suggested that Camden Council should adopt the principle that Bloomsbury should not be used by through traffic, someone tweeted:
Bloomsbury is indeed between the City and Euston, but there are four arterial roads that link the two, without having to enter Bloomsbury:
There are a number of steps that Camden Council needs to take within the context of a vision for Healthy Streets Bloomsbury
- Most urgent: Coordinate with TfL to allow right turns from Euston Road into Euston Station.
- Plug all the rat runs. (One can argue that the North-South Southampton Row could be considered an arterial road, but it is better not to slice through neighbourhoods – better to use Gower Street as arterial road). One should not be able to drive between opposite sides of the green square.
- Communicate the Vision
Of course, the Motoring Grid needs to be adopted on a city-wide basis, so that all neighbourhoods can benefit from reduced motor traffic.
We have introduced the concept exactly 3 years ago, and the Dutch have been implementing it for decades. How many yeas before authorities in London understand that it is an essential tool to deliver Healthy Streets?